# The Claims VP playbook for deploying AI investigation: budget, timeline, change management

> **TL;DR** Treat AI investigation as a claims-org buy, not an IT one. Scope a 90-day pilot at 1,000 to 5,000 flagged cases across one or two lines, gate the scale phase on cycle time and audit-trail exit criteria, and report coverage, cost per case, cycle time and loss-ratio delta at month 12.
>
> - Auto and workers comp go first: highest referral volume, best-defined red flags.
> - No SIU headcount cuts in year one; freed capacity works the uninvestigated 75%.
> - Compliance joins in week one - NAIC Model 680 is filed in 48 states.

- **1,000 - 5,000** - Cases to scope in a 90-day pilot (1-2 LOBs, auto and workers comp)
- **75%** - Flagged claims closing uninvestigated (the tier full coverage picks up)
- **25% to 100%** - Flagged-claim coverage shift (manual SIU baseline to AI-investigated)
- **14+ days to minutes** - Cycle time per case (manual SIU vs AI investigation)

A Claims VP at a Top 50 P&C carrier watches three numbers every quarter: the SIU caseload, the cost per investigated claim, and the loss ratio on lines where fraud is concentrated. AI claims investigation moves all three. The hard part is scoping a buy the CFO will sign, the CIO will integrate, and the SIU director will run.

This playbook is for the Claims VP who has to defend the line item. The wider stack is in our [autonomous AI claims investigation pillar](/blog/autonomous-ai-claims-investigation-pillar/).

## The pre-RFP diagnostic: why this is a Claims VP decision

The AI investigation buy belongs in the claims-org budget, not the IT capital plan. Three signals say so: SIU capacity is the binding constraint on loss-ratio improvement. Cost per investigated case is the lever the CFO will model. And the antifraud-plan filing under [NAIC Model Act #680](https://content.naic.org/sites/default/files/model-law-680.pdf), adopted in 48 states, is a claims-org responsibility, not an IT one.

At most Top 50 carriers, a manual SIU investigation takes 14+ days per case, an investigator carries 200+ cases, and only about 25% of flagged claims actually get investigated. The other 75% close on adjuster judgment without an investigation file.

SIU staffing growth, per the [Insurance Information Institute](https://www.iii.org/fact-statistic/facts-and-statistics-insurance-fraud), slowed to 1.4% in 2021-2022 from 2.5% the prior year. The capacity gap is widening, not closing.

AI investigation is not a detection-vendor swap. FRISS, Shift Technology, and Verisk ISO ClaimSearch keep doing what they do at FNOL. Investigation is the downstream layer, covered in our piece on [prevention, detection, and investigation as three distinct layers](/blog/insurance-fraud-prevention-vs-detection-vs-investigation/).

## Budget framework: what to ask for and how to model ROI for the CFO

A defensible budget ask has three parts:

- Scope the 90-day pilot at 1,000 to 5,000 cases on one or two lines and have it quoted against that volume.
- Plan the 12-month rollout run-rate to scale with flagged-claim count rather than seats or headcount.
- Carry the ROI in basis points of loss ratio on AI-investigated lines.

Build the CFO model on coverage-corrected unit cost, not headline per-case price. Manual SIU carries a high fully loaded cost per case and reaches about 25% of flagged claims. AI investigation reaches 100% at a unit cost low enough that the marginal cost of one more investigation stops driving the triage decision.

On a carrier flagging 50,000 claims per year, the manual budget covers about 12,500 cases, and covering all 50,000 lands well under that same budget. The fraud caught in the previously uninvestigated 37,500-case tier is the loss-ratio story, not the per-case savings.

Bring two scenarios: a conservative model at a 5% confirmed-fraud rate on the incremental coverage and a base case at 10%, matching the P&C fraud rate cited by the Coalition Against Insurance Fraud.

**Figure 1 (CFO model · coverage-corrected) - The CFO story is the 37,500 flags that close uninvestigated.** A carrier flagging 50,000 claims a year funds manual SIU for about a quarter of them; the loss-ratio upside sits in the rest.

50,000 minus 12,500 equals 37,500

- Flagged claims a year: 50,000 (The carrier in this example)
- Covered by the manual SIU budget: about 12,500 (About 25% of flagged claims)
- Close with no investigation file: 37,500 (The tier full coverage picks up)

**Two scenarios to bring the CFO**

- Conservative: confirmed fraud on incremental coverage: 5%
- Base case: the P&C fraud rate (CAIF): 10%

*Tie payback to loss-ratio basis points on AI-investigated lines, not per-case savings.*

**Price the fully loaded case.** Implementation services, evidence-pack storage and adjuster training land in the SOW, not the software line. Fund the 60 to 90 days of parallel running too.

Source: Worked example from this article: a carrier flagging 50,000 claims a year at about 25% manual coverage (Hesper internal benchmark). Fraud-rate scenarios per the article's CFO guidance; 10% is the P&C fraud rate cited by the Coalition Against Insurance Fraud.

| Where flagged claims land today, and under full coverage | Value | Share |
| --- | --- | --- |
| Flagged claims investigated today | 25% | 25% |
| Flagged claims closing with no investigation file | 75% | 75% |
| Flagged claims investigated under AI coverage | 100% | 100% |

Two pitfalls show up in CFO reviews:

- Services markup on integration. The quoted per-case rate is almost never the loaded cost, because implementation services, evidence-pack storage, and adjuster training all land in the SOW. Ask every vendor to price the fully loaded case.
- Parallel-run costs. Most carriers underfund the 60 to 90 days when SIU runs the old workflow next to the AI-assisted one for audit confidence.

The full list is in our breakdown of [hidden integration costs for legacy claims AI](/blog/hidden-integration-costs-legacy-claims-ai/). For ROI scenarios across three carrier sizes, see our [ROI case studies for AI claims investigation](/blog/roi-ai-claims-investigation-case-studies/).

> **Interactive tool:** Size your pilot and 12-month budget - available on the original article page.

## The 12-month timeline: pilot, scale, mature

Commit to phase-gate decisions, not a 12-month lock. Phase 1 is a 90-day pilot on one or two lines, typically auto and workers compensation. Phase 2 scales to more lines once the pilot signal is clean. Phase 3 retires manual triage on the covered lines.

| Phase | Months | Scope | Commercial gate | Outcomes to measure |
| --- | --- | --- | --- | --- |
| Pilot | 1 - 3 | 1,000 - 5,000 cases; 1-2 LOBs (auto, workers comp) | Fixed scope, priced against the pilot case count | Cycle time, false-positive resolution, integration latency |
| Scale | 4 - 9 | 20,000 - 50,000 cases; add homeowners, commercial, BI | Funds only if the pilot exit criteria clear | Coverage %, cost per case, SIU role redesign |
| Mature | 10 - 12 | 50,000 - 100,000 cases; all flagged claims in scope | Run-rate moves into the claims operating review | Loss-ratio delta, antifraud-plan refresh under NAIC #680 |

Write three pilot exit criteria into the SOW before signature:

- Investigation cycle time measured in minutes on 95% of pilot cases.
- False-positive resolution rate above 80% on rules-flagged claims (since rules-based detection runs [60-85% false positives in industry studies](https://insurancefraud.org/fraud-stats/)).
- Zero unresolved compliance flags from the SIU director on audit-trail completeness.

If any of the three miss, the scale phase does not auto-fund.

**Figure 2 (Phase gates) - The scale phase funds only if the pilot clears all three exit criteria.** Commit to phase-gate decisions, not a 12-month lock: each phase widens the case count only after the last one proves out.

1. **Pilot · months 1-3: 1,000 - 5,000** - Cases on one or two lines, usually auto and workers comp
2. **Exit gate: All three** - Written into the SOW before signature. Any miss and scale does not auto-fund
3. **Scale · months 4-9: 20,000 - 50,000** - Adds homeowners, commercial property and bodily injury
4. **Mature · months 10-12: 50,000 - 100,000** - All flagged claims in scope; the run-rate joins the claims operating review

**Exit criteria: Miss one and the scale phase waits.**

- 95% of pilot cases with investigation cycle time measured in minutes
- above 80% false-positive resolution on rules-flagged claims (rules run 60-85%)
- zero unresolved SIU compliance flags on audit-trail completeness

Source: Phases, case counts and exit criteria from this article's 12-month rollout plan. The 60-85% false-positive range for rules-based detection is from the industry studies the article cites.

## Stakeholder map: the question each one will ask

Run this procurement without a written stakeholder map and you will lose 60 to 90 days of cycle time to ad-hoc objection handling, mostly from CIO security review and legal review of third-party data use. Pre-empt every reviewer with the one question they actually care about.

| Stakeholder | The question they will ask |
| --- | --- |
| SIU Director | Does this give me audit-defensible cases on 100% of flagged claims without breaking my case routing? |
| CIO / CTO | What is the integration surface to Guidewire ClaimCenter or Duck Creek, and does the vendor have a current SOC 2 report? |
| Compliance | Does the audit trail satisfy NAIC Model Act #680 and align with state-level rules like California 10 CCR 2698.36? |
| Legal | Who owns the investigation work product, how is third-party data licensed, and how does EUO evidence flow into the case file? |
| Operations Manager | What does adjuster training look like, and how does day-one workflow change for front-line claims? |
| CFO | What is the coverage-corrected cost per case, and where does the loss-ratio impact show up in the next four quarters? |

The working documents for these conversations:

- [The third-party risk review that sets an AI deployment date](/blog/procurement-vendor-risk-ai-claims-investigation/) walks the artifacts and contract clauses reviewers ask for.
- The 12-point evaluation framework in our [AI fraud investigation vendor checklist](/blog/evaluating-ai-fraud-investigation-vendors-checklist/).
- For the legal reviewer, [the general counsel's guide to AI fraud investigation](/blog/general-counsel-ai-fraud-investigation-litigation/) covers discovery, privilege, and admissibility.

Compliance is the reviewer most likely to be skipped and most likely to slow the deal in week 10. Bring them in at week one.

The relevant state rule for California carriers is [California 10 CCR 2698.36](https://www.law.cornell.edu/regulations/california/10-CCR-2698.36), which requires the SIU to investigate each credible referral of suspected fraud and to document any decision not to investigate. AI investigation makes that easier: every flagged claim gets a documented decision in the audit log, the exact artifact the state DOI asks for in market conduct exams.

## Change management: deploying AI without burning out SIU adjusters

The failure mode at carrier rollouts is anxiety, not pushback. SIU adjusters who handled roughly 10 investigations per month manually do not know what a review queue no longer capped by headcount means for their job. The Claims VP needs three written commitments before the first case routes, all communicated to SIU staff in the same memo.

**Figure 3 (The SIU memo) - The investigator stops gathering data and starts deciding on evidence packs.** The three written commitments that go to SIU staff before the first case routes, drawn as a decision-rights map.

Input: Flagged claim routed to SIU (Referral_alert.pdf, Claim_file.pdf, Recorded_statement.mp3)

**AI layer** (Logged, sourced, timestamped)

1. Document collection and review
2. Database and index-bureau lookups
3. Statements cross-referenced, timeline rebuilt
4. Evidence pack with sources and recommended next actions

15+ investigation phases in parallel

Hand-off: Evidence pack

**Investigator decides** (SIU director is the final authority)

- Finding, referral or denial
- Accept or dispute the AI output
- Escalate a dispute to the SIU director

Agent recommends. Investigator decides.

**When the investigator disputes an output**

1. Investigator marks the AI output as disputed
2. The SIU director makes the final call
3. Logged and reviewed monthly for model-quality signal

**75%** - No SIU headcount reduction in year one. The freed capacity works the 75% of flagged claims that used to close uninvestigated.

Source: Illustrative decision-rights map built from the three commitments in this article. Agent scope per Hesper product scope; 15+ phases and the 75% uninvestigated share are Hesper internal benchmarks.

(Illustrative example)

1. No SIU headcount reduction in year one. The freed capacity covers the 75% of flagged claims that were previously uninvestigated, where the incremental fraud recovery sits.
2. The investigator becomes the decision-maker over AI-produced evidence packs. Judgment stays human; data gathering, document collection, and database lookups move to the AI layer running 15+ phases in parallel.
3. A named escalation path for any AI output the investigator disputes, with the SIU director as the final authority. Disputed outputs are logged and reviewed monthly.

The director's side of that rollout is mapped week by week in the [SIU director's first 90 days with AI investigation](/blog/siu-director-first-90-days-with-ai/). The manager-level version - who tells the team what, and when - is in [leading a claims team through AI-augmented investigation](/blog/claims-operations-manager-ai-transition/).

Named-insurer evidence helps at the SIU town hall. AXA Switzerland's deployment with Shift Technology caught a CHF 120,000 false claim involving intoxicated workers in the first week after deployment, per Samuel Klaus, Head of Fraud at AXA Switzerland, in the published [Shift Technology case study](https://www.shift-technology.com/resources/case-studies/axa-switzerland-insurance-fraud-detection-success).

## The 12-month outcomes report: what to bring to the CEO and Board

Four metrics belong on the month-12 board report, and only four:

- Investigation coverage as a percent of flagged claims.
- Cost per investigated case.
- Cycle time per case.
- Loss-ratio delta on AI-investigated lines, isolated from rate action and other claims-handling changes.

| Metric | Manual baseline | Mature-state target |
| --- | --- | --- |
| Investigation coverage of flagged claims | ~25% | 100% |
| Cost per investigated case | High: fully loaded investigator time | A fraction of manual |
| Cycle time per case | 14+ days | Minutes |
| Caseload per investigator | 200+ open cases | Not capped by headcount |

The board narrative is a coverage story, not a per-case cost story. The carrier is now investigating four times as many flagged claims at lower total cost, with documented decisions on every claim. The loss-ratio delta lands in months 6 to 12.

The forward question for the Board is whether the carrier's antifraud plan, SIU role definitions, and reinsurance reporting reflect a 100%-coverage operating model. Carriers that lock that operating model in 2026 will price 2027 books on a different loss-cost curve than carriers still triaging at 25% coverage.

## Key takeaways

- AI claims investigation is a claims-org budget item, not an IT line. The loss-ratio lever and the NAIC Model Act #680 filing both sit with the Claims VP.
- Scope a 90-day pilot at 1,000 - 5,000 cases on 1-2 lines, priced against that case count.
- The CFO math is coverage-corrected: the fraud caught in the previously-uninvestigated 75% is the loss-ratio story.
- SIU headcount does not get cut in year one. Investigators move from data gathering to decision-making.

## Frequently asked questions

### What integration work does my CIO actually have to do?

Three integration points need scoping: the claims system of record (Guidewire ClaimCenter, Duck Creek, or in-house), SIU case management, and any detection vendor feeding flagged claims into investigation. Standard CIO checklist: a current SOC 2 report, data residency and PII handling, role-based access control, and audit-log export to your SIEM. Plan on 60 to 90 days from signed SOW to first production case.

### What is the regulatory exposure of using AI agents on fraud claims?

Less than most Claims VPs expect, if the audit trail is complete. NAIC Model Act #680, adopted in 48 states, requires an antifraud plan with documented SIU procedures, training programs, and standard operating procedures for investigating suspected fraud; it does not prescribe whether the investigator is human or AI-assisted. Refresh your antifraud-plan filing to reflect the AI-assisted workflow.

### What is the typical procurement cycle for AI claims investigation?

Plan for 8 to 16 weeks from RFP issue to signed pilot SOW at a Top 50 carrier. Compress this by running the stakeholder map in parallel, not in sequence. Most slippage happens in legal review of data use and indemnification, and in CIO security review when the vendor cannot produce a current SOC 2 report. Pre-qualify on those two items before issuing the RFP.